When your full size Crabster is completely built, what will be the first body of water where it is tested?

We will finish the integration of CR200 at the end of April. The hardware, software, communication and various algorithms will be integrated and tested in April. From the May, we will conduct the integrated shop test for CR200. We will check the integrated functions of CR200 such as remote control of posture, walking and interface of various sensors in May. If there is no problem in the shop test, we will go for sea trials in mid of May. The first sea trials will be conducted at pier of Geoje branch of KIOST which is located in the south of Korea. As you know, however, the schedule is changeable because there may be unexpected situation.